Renovations

PipeworkWindow CrackSend-a-message
Before the Renovations

Images of the Old Post Office in Morrinsville, before its transformation into an Art Gallery.

1a. ready for the new floor4. New flooring!5. Exterior painting
Final Renovations! Weeks 11 - 14

Sept 13th - October 8th The final month of renovations flew past in a flurry of activity, as the building ...

4. Office6. Control panel3. Wallace panels
Renovations: Weeks Nine and Ten

August 30th - September 10th: I've now moved into the Gallery, to my new office! It's still a building site, ...

7. Reception1. Exterior painting3. Air con
Renovations: Weeks Seven and Eight

August 16th-27th: the interior painting is finished, the extra bits of 'solid plastering' done, the toilets ...

4b. Painting5. Sculpture Garden8a. Wallace Gallery
Renovations: Weeks Five and Six

August 2nd-13th: Week Five saw the removal of asbestos in the reception area ceiling, and then the painters ...

1. Community Gallery7. Staff area9a. Asbestos removal
Renovations: Week Four

July 26th-30th: the first main phase of interior construction came to an end this week, with many details ...

3. plywood walls9i. The Wallace view9g. The Wallace view
Renovations: Week Three

July 19th-23rd: Progress continues apace, as the walls are lined with sheets of ply, then gib board (so there ...

water heaterfrom inside the officeplumbing
Renovations: Week Two

July 12-16th 2010, and big changes are being made to the internal wall-structure, transforming the post ...

5. Exhibition Gallery grows2. out goes the office3. Timber
Renovations: Week One

See the blog for a more detailed description of the first week of construction on the gallery site. See ...

 